Skip to content
New: ask the Rexfin Analyst Agent about your model. Every figure comes back cited.

Use case

Budget planning & forecasting

Build driver-based budgets and rolling forecasts on top of actuals that are already reconciled to the ledger, so every variance you report traces back to a real, cited number instead of a re-keyed export.

Animated loop: plan and actual bars converge and update a rolling forecast.

Built on actuals already reconciled from

  • PDF filings
  • Bank statements
  • ERP exports
  • ZATCA e-invoices
  • Excel schedules

The old cycle

Budget season shouldn't start from a blank workbook every year.

  • Actuals still get re-keyed from a spreadsheet export before a budget can even start.
  • Finance, sales, and ops plan in separate sheets that never reconcile with each other.
  • A rolling reforecast means rebuilding formulas, not just changing one assumption.
  • Every cycle starts from a blank workbook instead of a reconciled base case.

A more coherent cycle

One forecast, tied to the ledger the whole way through.

Book a live walkthrough
Live model · not a recording

A guided walkthrough of a live model: every figure on screen still carries its own citation.

Insight, not re-keyed data

Variance narrative draws from the same cited figures already sitting in the board pack, nothing gets exported and retyped first.

React at reforecast speed

Change one driver in plain language and every dependent line recomputes across the model, deterministically.

Planning as one team

Finance and the functions it plans with work from the same governed definitions, not divergent spreadsheet copies.

Key features

What a reconciled budget cycle runs on

Branch a what-if without forking the plan

Test a hiring freeze, a price change, or a downturn in plain language: every dependent line recomputes against the same reconciled base case, never a detached copy.

58%
Baseline
86%
Best case
34%
Downturn

Aligned across every planning surface

Budget owners, FP&A, and the functions finance plans with all read from one governed definitions layer, so a driver means the same thing in every forecast.

Granular access rights

Role-based access and per-organization isolation keep sensitive drivers scoped to the people who should see them.

Actuals and forecast, one line

Add a new actual period and the forecast months ahead of it recompute in place: no separate tab, no manual splice.

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug

Not a rating. A chain.

Every figure in this plan can show its own proof.

  1. 1 Filed
  2. 2 Extracted
  3. 3 Reconciled
  4. 4 Cited
  5. 5 Exported
Reconciled p.24

FY2025 budget vs. actual: Revenue

+28.5% vs. prior period

Reconciled p.31

Hiring-freeze scenario: Payroll

−6.2% vs. prior period

Reconciled p.19

Rolling OPEX forecast: Q3

+4.1% vs. prior period

Frequently asked

Questions about budgeting and forecasting.

What makes a budget "reconciled" here, rather than just entered?

Every actual behind the budget has already been checked against the printed subtotal on its source document. The budget compares to that tied-out number, not a re-keyed one.

How is a rolling reforecast different from rebuilding the model?

A reforecast changes an assumption in plain language (hiring, pricing, a demand shift) and the deterministic engine recomputes every dependent line. The structure of the model never changes underneath you.

Can I test a hiring freeze or a downturn without breaking the live plan?

Yes. Scenarios stay tied to the underlying reconciled base case, so a what-if recomputes on its own branch and never overwrites the plan everyone else is working from.

Where does the variance narrative come from?

From the same cited figures already used in the board pack: the variance explanation and the reported number are never two different data pulls.

Can I just ask questions about the budget instead of building a report?

The Analyst agent answers plain-language questions over your model and its cited actuals: retrieving figures, running the calculation, and citing what it computed from.

What happens if a figure can't be reconciled yet?

It doesn't quietly enter the plan. Nothing exports (board pack or statement) until the reconciliation checks agree; an unverified number gets refused, not shipped.

Do we need a live ERP connection before we can start budgeting?

No. Excel, CSV, or PDF upload works standalone, so modeling can start before any live connection exists.

Get started

Plan the next forecast on evidence, not an export.

Book a walkthrough and we'll build a rolling forecast from a sample of your own actuals: reconciled, cited, and ready to reforecast on the spot.